Network route planning
Drain routes mapped against the site plan and building layout

Jahra
Sewer network installation in Qasr starts by surveying the plot and planning pipes from each bathroom and kitchen to the collection chamber. We dig with precise falls, lay pipes with test bends and run water-pressure tests.
Al Qasr in Jahra has modern mid-sized family houses with multiple storeys and spread facilities, needing careful network planning to avoid load-bearing walls and footings. We mark waste routes under side passages and set inspection chambers outside the building near the boundary. Most connections near Al Qasr Co-op link to the public network, each site having its own layout.
Al Qasr is a residential district in Jahra governorate, marked by relatively uniform house designs that simplify planning buried networks.
Before handover, all pipes are flooded for one hour and every connection is inspected for seepage.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, we always avoid running pipes under footings because movement damages pipes and risks the foundation. We plan a side route outside the building even if it adds distance.
A minimum of two, one at the building exit and another at the boundary before public connection. If the route is long or has sharp bends we add extra chambers for easy access.