Network route planning
Drain routes mapped against the site plan and building layout

Mubarak Al-Kabeer
The buried sewer network in Qosor begins at bathroom and kitchen fixtures and ends at the collection chamber on the property boundary. We chart the route carefully along the natural ground slope, grade the pipes, and test flow before final backfill.
Qosor has modern villas with varied designs, main bathrooms often on the first floor while the collection chamber sits at the southern property edge. This means long sewer runs that may pass under concrete floor slabs or paved pathways. We inspect the available route and mark entry and exit points, and where the network meets a paved strip we dig carefully around reinforcement and grade the pipe to avoid cracking.
Qosor sits in southern Mubarak Al-Kabeer, a villa neighbourhood where sewer lines extend from upper floors to the property boundary.
We test each network with gradual filling and monitor velocity because long pipes need a consistent fall of at least 1 cm per metre.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We grade the pipe with sufficient fall along the entire run even if it extends over 20 metres. If the height difference is small we use a larger diameter pipe or insert an intermediate chamber between the two points.
Yes, but we open channels next to steel reinforcement and lay pipes with care. After testing we backfill the channel and reset the paving to the same level.
