Network route planning
Drain routes mapped against the site plan and building layout

Capital
Sewer networks for commercial and residential projects in Rai are laid under wide road and parking areas. We route pipes away from existing electric and water lines, dig under pavements on steady fall, lay heavy-duty cast pipes with protection against traffic load and movement, and test the network under high pressure.
Rai's commercial zone has major shopping centres, multi-storey buildings and vast parking areas, meaning the network must resist vehicle load and future digging. Pipes run under thick pavements and asphalt layers, so we use heavy-duty cast pipes with a protective sand layer above. Sewer routes must coordinate with existing water and electricity lines, we maintain safe distances and mark dig points clearly to prevent future damage.
Rai is in Kuwait governorate and is known for The Avenues shopping centre and major ring road intersections.
We test the network by pumping water under 0.5 bar pressure for one hour to detect leaks at joints beneath pavements.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use thick cast pipes with 30 cm sand layer above before paving. We pressure-test pipes with high water pressure before backfill to verify load bearing capacity.
Yes, we provide a complete network map with coordinates for every joint and inspection chamber. We mark surface GPS points to show pipe routes under pavements and roads.