Network route planning
Drain routes mapped against the site plan and building layout

Jahra
Sewer network installation in Saad Al-Abdullah City starts with mapping pipe runs from every fixture to the boundary chamber. We dig trenches at steady fall under foundations and walkways, test each section with water before backfill and handover. We confirm pipes bedded in clean sand and correct fall maintained throughout.
Saad Al-Abdullah City consists of detached villas in rows with front gardens and rear courtyards, each villa holding a kitchen, main bathroom, guest bathroom and in some a servants' room. The sewer network starts at all these points and runs downward underground to a collection chamber in the yard. We test the fall on each branch from kitchen and bathrooms separately before joining them to the main pipe under the side access strip. One percent fall over this loose sand is critical, and any shallower gradient means slow flow and settlement. At the boundary chamber we verify the external connection with a full water seal before handover.
Saad Al-Abdullah City lies in Jahra governorate, a planned residential area where sewer networks require precise fall and bedding under villa foundations.
We dig trenches to consistent width and bed pipes on clean sand layers because the dry surrounding sand does not give uniform bearing.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure depth and horizontal distance before digging and use a laser level to set trench bottom height accurately. We move from villa to villa on a calculated path that ensures consistent descent all the way.
We find it during the water test before backfill. We reopen the trench and shift the pipe lower by the needed amount, or regrade that section to join another branch with better fall.