Municipal tie-in
connecting the property drain to the public sewer at the correct entry point

Mubarak Al-Kabeer
Connecting to the public sewer in Sabhan Industrial begins by locating the branch sewer line under the industrial street. We dig, join, test under actual operating pressure and hand over full test footage.
Factories and warehouses in Sabhan Industrial generate high water flow from processes and cooling systems, and municipal lines here are zoned by sector. We measure your water discharge and identify the correct sector line, then join with adequate pipe diameter and steady fall that handles sustained high pressure.
Sabhan Industrial is located in Mubarak Al-Kabeer governorate and has a municipal sewer network designed to handle heavy industrial loads.
We test the connection with continuous water flow for at least one hour to ensure no leaks occur under the actual pressure of operation.
connecting the property drain to the public sewer at the correct entry point
setting pipe fall so flow is self-cleaning and solids do not settle
installing a chamber at the junction point for future access and cleaning
internal filming of the joined line before backfill, customer views the screen
confirming all joints hold before the excavation is permanently closed
connecting new construction or building extensions to the existing public main
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We calculate it from your peak water discharge rate. We ask for technical data on your warehouse drainage system, then select the diameter that ensures flow velocity between one and two metres per second.
Yes, safe connection requires your facility outlet to be dry or blocked off. We need closed valves before we dig, join and test the new line.
