Sewer network installation
Laying internal and external sewer pipes with correct fall and alignment

Capital
Sewer network installation in Shuwaikh begins with a site plan and locating the municipal main connection point. We run clay or concrete pipes from every bathroom and kitchen to a central inspection chamber, then test the falls and joints before backfilling.
Shuwaikh has scattered commercial buildings, shops and small warehouses spread apart, meaning sewer lines must travel long distances with consistent gradient across scattered sites. We route pipes to fall at least 1:100 so solids and grease do not settle. Inspection chambers are placed every 40 metres for access to future blockages.
Shuwaikh sits near Shuwaikh Port and a science park, a light commercial zone where each building needs its own connection to the main sewer line.
Before backfill, every joint is tested with a camera run through the inspection chamber to check for cracks or sharp bends.
Laying internal and external sewer pipes with correct fall and alignment
Tying the building network into the public sewer at the designated manhole
Camera survey confirms no offset joints, sags or debris before backfilling
Constructing or placing inspection chambers at correct intervals along the network
Testing joint integrity to confirm no leaks before the trench is covered
Drainage works for villas, commercial buildings, and residential complexes
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The municipality requires minimum depth of 1.2 metres below surface to protect pipes from pressure and heat. We account for groundwater level and add concrete protection at sensitive spots.
Yes, if buildings are close and the line maintains steady gradient. Each building takes a separate branch that joins the main at an inspection chamber.