Sewer network installation
Laying internal and external sewer pipes with correct fall and alignment

Hawalli
The sewer network in Siddiq serves a densely built residential district with closely spaced multi-storey apartment blocks. We connect each building with a dedicated line sloping to a shared inspection chamber in the district then to the municipal main line. Every connection and chamber is tested with pressurized water before handover.
In Siddiq buildings are very close together and foundation gaps very narrow, so the design must route parallel pipes under the central street. We measure spacing between each building foundation and the next and position the shared chamber in the street away from entrances and garages. Pipes are buried deep enough to survive vehicle and heavy truck traffic overhead.
Siddiq is in Hawalli governorate near Siddiq Co-op, an urban residential district crowded with many-storey apartment buildings.
Buried pipes are tested with water at pressure equal to or above actual operating pressure to confirm integrity.
Laying internal and external sewer pipes with correct fall and alignment
Tying the building network into the public sewer at the designated manhole
Camera survey confirms no offset joints, sags or debris before backfilling
Constructing or placing inspection chambers at correct intervals along the network
Testing joint integrity to confirm no leaks before the trench is covered
Drainage works for villas, commercial buildings, and residential complexes
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Because foundation spacing in Siddiq is too tight for safe digging under buildings. The main street is wider with better protection from loads. Each building connects via a short branch descending from its entrance to the main street pipe.
We bury pipes over one metre deep and cushion them with sand and gravel before resurfacing. We choose heavy-wall pipes to withstand both mechanical load from traffic and hydraulic pressure during operation.