Sewer network installation
Laying internal and external sewer pipes with correct fall and alignment

Ahmadi
Sewer networks in Zour serve power generation units and auxiliary facilities through large-bore pipes handling high flow rates. We analyse discharge patterns from each generating unit and extend main lines toward the central collection well. Pipes are tested under high pressure and discharge standards are documented before final connection to municipal wastewater treatment.
The power plant in Zour discharges large volumes of condenser cooling water, filter backwash, control rooms and washbasins at set times. Main lines must handle variable flows that may contain particles and minerals, so we install straining units before narrow-bore sections. Inspection chambers must be deep with wide access because cleaning requires heavy equipment.
Zour sits in Ahmadi governorate and houses a large power generation station and water treatment plants linked to the national electricity grid.
Pressure tests are run on each separate section at flow rates simulating the plant's maximum expected sewer load.
Laying internal and external sewer pipes with correct fall and alignment
Tying the building network into the public sewer at the designated manhole
Camera survey confirms no offset joints, sags or debris before backfilling
Constructing or placing inspection chambers at correct intervals along the network
Testing joint integrity to confirm no leaks before the trench is covered
Drainage works for villas, commercial buildings, and residential complexes
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The pipes themselves yes, but we install metal mesh and sand screens in the first chamber to trap large particles. This protects smaller-bore sections and reduces sediment buildup.
Roughly every three months collection chambers are inspected for sediment and cleaned by vacuum trucks. We leave documented records for plant management to track the maintenance schedule.