Cesspit emptying
Full pit evacuation to the base, preventing overflow into the property

Jahra
Sewage tanker suction in Jahra New serves residential blocks and villas with precise and rapid pit emptying. We position our tanker at the pit opening, run the hose from ground level to the bottom and extract all sludge and contaminated water with a stable powerful motor. Your pit comes away dry and completely clear and safe for continued use.
Jahra New is a fast-growth district with modern apartment blocks and new villas, most with concrete pits at standard depth under the foundations. Modern pits are usually designed correctly with uniform access openings, which speeds our work considerably. We inspect the opening from outside and confirm that incoming pipes from the house carry no solid non-degradable matter that could block the suction hose.
Jahra New sits in Jahra governorate near Jahra Mall and Jahra Hospital.
We issue a receipt with the suction date and tanker number used so you can track final disposal.
Full pit evacuation to the base, preventing overflow into the property
Clearing sealed sewage tanks in buildings and residential complexes
Round-the-clock response when overflow cannot wait until morning
Removing settled sludge caked to the pit walls after main suction
Measuring pit level and advising on a suitable emptying schedule
Emptying pits serving kitchens that produce heavy grease loads
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Usually no, because a new empty pit can hold wastewater for several months before filling. We recommend a first inspection at six months of use to see actual fill rate.
A slight smell may linger for a few hours, but we flush clean water through the pit after suction and cover it with a sanitary cap. The odour fades quickly in open air, especially in Jahra where wind is strong.
