Cesspit emptying
Full pit evacuation to the base, preventing overflow into the property

Capital
Sewage tanker suction in Kuwait City serves residential and commercial buildings between Liberation Tower and the Grand Mosque. We take your call and confirm pit address and dispatch the tanker on schedule. We handle shared underground pits and central sumps by positioning suction equipment at the right access point.
Kuwait City mixes old residential towers with very deep shared drainage systems and modern commercial buildings with independent individual pits. A shared pit under the street needs a manhole cover opened and a hose extending down eight metres sometimes. In modern buildings the pit might sit in a basement requiring us to move parked cars and coordinate with building management. Before each job we probe the pit contents to determine if it is full or still has empty space.
Kuwait City is the capital in Kuwait governorate where old and new drainage systems mix in complex patterns.
We check air relief valves before suction in high-rise buildings because underground pressure prevents air entering the pit.
Full pit evacuation to the base, preventing overflow into the property
Clearing sealed sewage tanks in buildings and residential complexes
Round-the-clock response when overflow cannot wait until morning
Removing settled sludge caked to the pit walls after main suction
Measuring pit level and advising on a suitable emptying schedule
Emptying pits serving kitchens that produce heavy grease loads
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we open the manhole cover quickly and set barriers around the work area and connect the hose from the tanker parked safely on the pavement. The job takes 30 to 45 minutes depending on pit depth and contents volume.
We use a long hose of 50 to 60 metres and park the tanker in the nearest available car park. The tanker pump is powerful enough to pull contents from underground at high pressure without spillage.
