Cesspit emptying
Full pit evacuation to the base, preventing overflow into the property

Jahra
Sewage tanker suction in Saad Al-Abdullah City empties your pit quickly and keeps your yard clean. We bring the truck to your site, connect the hose to the pit, suction under high pressure and rinse the opening before we leave.
Most new houses in Saad Al-Abdullah City are built with reinforced concrete and cement block, with deep pits under the rear yard sitting close to groundwater level. We inspect the pit walls and floor before suction to check for groundwater seepage inside. If we find deep seepage, we recommend more frequent emptying so groundwater does not overwhelm the drainage system.
Saad Al-Abdullah City lies in Jahra governorate, where planned houses sit densely packed with standard deep pits.
After each suction, we measure pit depth with a marked rod to confirm it has emptied fully.
Full pit evacuation to the base, preventing overflow into the property
Clearing sealed sewage tanks in buildings and residential complexes
Round-the-clock response when overflow cannot wait until morning
Removing settled sludge caked to the pit walls after main suction
Measuring pit level and advising on a suitable emptying schedule
Emptying pits serving kitchens that produce heavy grease loads
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It depends on family size and water use. A deep pit may need emptying every six months or less, while a smaller pit may need it every three months.
In most sites yes, groundwater sits close to surface level. We check pit walls for seepage, and if they allow groundwater in, the pit fills faster.
