Cesspit emptying
Full pit evacuation to the base, preventing overflow into the property

Capital
Tanker suction in Salhiya provides regular emptying of sewage pits beneath high-density commercial buildings and office complexes. We arrive with a equipped suction truck, clear the pit completely and inspect pipes from the tank inlet through to the main network outlet.
Salhiya's commercial buildings have deep pits below ground because the area is established and the public network is far down, and a single pit serves multiple floors and fills quickly during business days. We measure pit depth and capacity and check water level before suction to forecast annual cleaning frequency. If we find solids stuck to the walls, we pressure-wash them before final suction.
Salhiya sits in Kuwait governorate, a dense commercial district housing the Sheraton Hotel and Salhiya Commercial Complex.
After the first suction, we advise commercial buildings on a two-monthly emptying schedule because daily load from toilets and kitchens is high.
Full pit evacuation to the base, preventing overflow into the property
Clearing sealed sewage tanks in buildings and residential complexes
Round-the-clock response when overflow cannot wait until morning
Removing settled sludge caked to the pit walls after main suction
Measuring pit level and advising on a suitable emptying schedule
Emptying pits serving kitchens that produce heavy grease loads
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We suction the water first, then lower the intake to the pit floor to collect accumulated silt. If sediment sticks hard, we use high-pressure water to break it up before final suction.
Yes, we inspect the inlet from toilets and the outlet toward the public network for blockages. If we feel resistance during inspection, we continue checking with a mechanical cleaning tool.
