Blocked outlet clearing
Removing sand and silt blocking storm-water outlet pipes

Ahmadi
Storm-water drainage in Ruqqa focuses on a broad line network because homes sit close together and streets are narrow, causing water to pool quickly during heavy rain. We run sized pipes from roofs and paved grounds, connect them to municipal or private collection pits, and test full-pressure flush before leaving.
Ruqqa homes are closely spaced, with rear gardens often enclosed by walls and water collection pipes under shared eaves. We check each roof slope before fitting gutters, and avoid merging water from multiple roofs onto one point unless the primary pipes are large enough. Private pits here are typically two and a half metres deep and need cement mortar on internal walls to prevent sand seepage.
Ruqqa is a residential area in Ahmadi governorate between main roads where public drainage is limited and private lines are essential.
We dig private pits carefully above fine sand layers to avoid undermining adjacent foundations deeper than three metres.
Removing sand and silt blocking storm-water outlet pipes
Water jet cuts through compacted sand and dried silt inside the line
Internal filming before and after so the clear result is confirmed
New network laid to correct falls for the property footprint
Emptying and cleaning collection sumps and linked floor gullies
Pre-season visits to keep storm lines clear before rain arrives
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we maintain a safety gap of at least two metres between the pit and any adjacent foundation or wall. We check the site plan before choosing the pit location to avoid disputes.
Yes, but we bed the pipes in compacted sand and anchor them in a shallow concrete base to prevent shifting. Fine sand may settle slowly, so we re-test the line three months after completion for assurance.
