Site level survey
Ground elevation readings confirm the natural direction water will travel

Hawalli
Storm-drain network in Bidaa protects the villa from water pooling on tight plots near Salmiya seafront. We start with a thorough site reading, level survey and mapping natural water flow around the building. We design multiple runs draining roof, courtyard and paths on steady falls. Detailed drawings cover every pipe, trap and inspection point ready for construction.
Modern Bidaa houses stand at varying heights and coastal humidity worsens drainage problems, especially in rainy seasons. We survey the foundation and identify any natural slope, then design a network exploiting that fall. We use 75 or 100mm pipe for main runs and smaller lines for roof branches. We choose moisture and salt-resistant materials and add waterproof layers around the foundation to stop groundwater seepage.
Bidaa lies in Hawalli governorate near Salmiya's seafront, a district of upscale homes where coastal humidity seepage is common.
We test the network by running dyed water through it to track all pipes and confirm no side leakage.
Ground elevation readings confirm the natural direction water will travel
Expected flow volume determines the correct pipe diameter for each run
Gullies are positioned so no low point is left without an outlet
Chambers placed at every direction change to allow future maintenance
Adequate slope prevents sand settlement and keeps flow gravity-driven
Final discharge point set away from foundations, fencing and neighbouring plots
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, which is why we select PVC or HDPE pipes graded for coastal environments with thick protective layers. We wrap each line in fabric and gravel to isolate it from soil salt and moisture.
In Bidaa near the beach, we recommend clearing inspection points every six months or after heavy rain. We use a high-pressure water pump to flush the pipes and remove silt without damaging joints.