Site level survey
Ground elevation readings confirm the natural direction water will travel

Hawalli
Storm-drain design in Hawalli Midan starts with surveying ground and roof levels to map water flow direction. We plot pipe routes from collection points to a central sump or existing street outlet. We verify slopes and flow paths before handing over drawings to the contractor.
Old commercial buildings in Hawalli Midan near the main market have flat roofs with some dips, and existing pipework beneath floors is often tangled. We identify existing runs first through test holes, then design a new network that bypasses them or reuses what works. Roofs ringed by high walls need overhead pipes with strong gravity drain to the street.
Hawalli Midan lies in Hawalli governorate, an old built commercial district where buildings stand close and streets run narrow.
Before handover we run static water tests on each network section because uneven floors hide slope faults.
Ground elevation readings confirm the natural direction water will travel
Expected flow volume determines the correct pipe diameter for each run
Gullies are positioned so no low point is left without an outlet
Chambers placed at every direction change to allow future maintenance
Adequate slope prevents sand settlement and keeps flow gravity-driven
Final discharge point set away from foundations, fencing and neighbouring plots
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Only if testing proves they are sound and their slopes are correct. We fill them with water and watch for pressure drop over one hour. If they fail, new pipes must run above ground instead.
We run 4-inch pipes along the inner edge at 1:100 slope toward the lowest corner, then drop a vertical line to the street or deep collection pit. Light slope keeps the pipe stable without gravel scouring.