Site level survey
Ground elevation readings confirm the natural direction water will travel

Mubarak Al-Kabeer
Behind every good layout is a calculation, and storm-drain network design in Mubarak Al-Kabeer shows its working. We choose a design rainfall intensity, measure each catchment near Mubarak Al-Kabeer Co-op and size every pipe from the resulting flow, so the numbers can be checked.
Rain in this part of Kuwait is infrequent but can arrive in short, intense bursts, which is what a drainage system must handle. We use a design storm intensity suited to local conditions and the building's use, multiply it by each catchment area and a runoff coefficient for its surface, and size pipes to carry the result at a self-cleansing velocity. The calculation sheet is part of the drawing package, so an engineer or contractor can review how each pipe diameter was reached.
Mubarak Al-Kabeer suburb, near Mubarak Al-Kabeer Co-op and Messila Beach, sees rare but intense rain bursts that drainage must absorb.
Pipes are sized so design flow moves at a self-cleansing velocity that keeps sand from settling.
Ground elevation readings confirm the natural direction water will travel
Expected flow volume determines the correct pipe diameter for each run
Gullies are positioned so no low point is left without an outlet
Chambers placed at every direction change to allow future maintenance
Adequate slope prevents sand settlement and keeps flow gravity-driven
Final discharge point set away from foundations, fencing and neighbouring plots
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
From a calculation of catchment area, surface type and design storm intensity. The sheet is included with the drawings.
Oversized pipes run too slowly in light rain and collect sand. Correct sizing keeps them self-cleaning.