Site level survey
Ground elevation readings confirm the natural direction water will travel

Capital
Storm-drain design in Qortuba begins with precise site surveying and calculating roof and courtyard gradients. We map pipe routes from each drainage zone toward the collection well or street, sizing pipes by expected water volume. We deliver construction-ready drawings showing every turn, depth and junction.
Most Qortuba villas sit on separate plots with raised concrete or metal roofs, each roof draining to a perimeter gutter flowing toward the courtyard. When designing the network, we measure the height difference between roof, courtyard and street, because a shallow gutter cannot handle heavy rain without surface runoff. We plan intermediate collection pits with underground junction pipes linking courtyard to street, checking foundation levels to avoid cutting existing structures.
Qortuba is an upscale residential district in Kuwait City where drain networks must be precisely designed to protect villa foundations from soil moisture.
For each design section, we test the fall with a string level before issuing drawings to ensure steady flow.
Ground elevation readings confirm the natural direction water will travel
Expected flow volume determines the correct pipe diameter for each run
Gullies are positioned so no low point is left without an outlet
Chambers placed at every direction change to allow future maintenance
Adequate slope prevents sand settlement and keeps flow gravity-driven
Final discharge point set away from foundations, fencing and neighbouring plots
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure the pit diameter, depth and infiltration rate first. If it is too small or drains slowly, we add a second pit with an underground junction pipe connecting them.
We use flexible smaller-bore pipes where space is tight, or dig deeper beneath the narrow gap. Every section is flushed with flowing water before backfilling.
