Site level survey
Ground elevation readings confirm the natural direction water will travel

Hawalli
Storm-drain design in Shaab protects the villa from seawater humidity and seasonal rains near Sha'ab Park. We start by surveying the plot and measuring ground slope toward streets or open passages. We design a main drain line collecting water from all roofs and courtyards, moving it away without pooling. Drawings go to the contractor ready for immediate build.
Shaab houses near the seafront face high humidity and rainfall reaching courtyards and entries fast due to the area's gentle slope. We design drain runs starting from roof gutters in copper or plastic pipe then collecting them into larger ground lines. We position the main pit close to the street for easy access and cleaning, adding strainers at each collection point to stop leaves and sand clogging the pipes.
Shaab is in Hawalli governorate near Sha'ab Leisure Park, a villa district with dense urban fabric and proximity to the Gulf.
We test each drain line by running water under pressure to confirm no leaks at underground joints.
Ground elevation readings confirm the natural direction water will travel
Expected flow volume determines the correct pipe diameter for each run
Gullies are positioned so no low point is left without an outlet
Chambers placed at every direction change to allow future maintenance
Adequate slope prevents sand settlement and keeps flow gravity-driven
Final discharge point set away from foundations, fencing and neighbouring plots
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, internationally-graded plastic pipes in Shaab stay rigid for many years despite salt air. We choose thick-walled HDPE and protect it with a gravel layer and fabric wrapping below ground.
We install metal strainers at collection points on courtyards and passages near the beach, clearing them after each rain season. Mesh openings are sized precisely to stop sand without blocking water flow.
