Pipe routing
Mapping every copper run before walls are plastered over

Ahmadi
Central gas network installation in Dhaher demands understanding long spacing between houses and the burial depth needed to shield pipes from heat. We run pipes from the main meter to each house with a steady fall, testing every joint before handover.
Dhaher houses follow desert patterns, typically poured concrete with deep footings. Pipes run underground from the main well to each house at least one-and-a-half metres deep to protect them from temperature swings. We use copper pipes with thick foam insulation and fit isolation valves at each house entry for maintenance access.
Dhaher sits in Ahmadi governorate near the Saudi border, a district of scattered detached desert houses.
The network is tested at five times operating pressure for a full hour to verify all welds and fittings.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we lay coloured warning tape and wooden pegs along the pipe route to alert well-diggers and other contractors. We give the owner a precise map showing the network location beneath the ground.
We ultrasonic-test every welded joint and run a hydrostatic pressure test on each pipe section. Only after all tests pass do we begin excavating and burying with thermal wrap and warning tape.
