Pipe routing
Mapping every copper run before walls are plastered over

Capital
Central gas network in Rai is installed in large commercial and administrative projects with protected routes and tested before decoration and insulation. We start from the main meter room and extend branches to restaurants, cafes and complexes under regulated pressure.
Rai's commercial zone around The Avenues and IKEA includes food outlets, offices and hotels needing separate gas branches and accessible maintenance paths. We use galvanized steel tubing 50 mm diameter or larger for heavy loads and install visible stop boxes on each floor. Pipe runs under suspended ceilings ease periodic inspection and repair without dismantling the structure.
Rai in Kuwait governorate is an active commercial zone near the Fifth Ring Road, home to Kuwait's largest shopping centers and service complexes.
We monitor main network pressure hourly during continuous 24-hour testing to confirm it remains stable under changing loads.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if we size the pipe diameter correctly based on the number of burners and ovens expected to run together. We calculate total load in kilowatts and choose diameter that maintains 20 millibar reserve pressure.
We install separate isolation points on each branch to shut it down alone without stopping others, so maintenance is quick with no full service interruption. We leave a documented pipe map and emergency contact numbers with the site manager.
