Central gas first-fix
Main gas network laid and pressure-tested before walls are plastered.

Capital
Central gas line installation in Jaber Al-Ahmad City demands precision calibration since new buildings have uniform floor plans. We run copper lines from the main supply point to the kitchen, heating and water heater, checking every joint for bubbles before handover.
Jaber Al-Ahmad City is a relatively new residential district with contemporary buildings and orderly clusters of villas and apartment blocks. Every building here has a central service room and base pipework prepared by the main contractor, and we complete the secondary network and connect consumption points. We pressure-test in two phases: the main line first, then each branch after it is connected.
Jaber Al-Ahmad City sits in Kuwait governorate and is a modern residential development where standardized floor plans simplify network coordination.
We record opening and closing pressure readings on each flat to document that the line is sealed before handover to the family.
Main gas network laid and pressure-tested before walls are plastered.
Residential kitchen gas points run to correct sizing and outlet count.
Commercial kitchen gas networks sized for high demand with isolation at each appliance.
Leak located with detection instruments before any wall or floor is opened.
Ball valves fitted at the main inlet and at every branch point.
Periodic check of all valves, joints and fittings across the gas network.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we complete every connection from the main supply to each appliance and test it individually before handover. The appliances themselves are installed by the homeowner or a specialist technician.
We fill the line with compressed air and watch the pressure gauge for at least thirty minutes. If the reading stays stable there are no leaks and we switch to live gas.
