Central gas first-fix
Main gas network laid and pressure-tested before walls are plastered.

Jahra
Central gas line installation in New Jahra starts by connecting from the district main to the first house meter, then extending pipes to kitchen and heater. We purge with compressed air first, then test with nitrogen before live gas activation.
New Jahra homes are recently built and many were not pre-equipped with gas networks, so they need complete ground-up installation. We run copper pipes through hollow wall cavities in ground floors and under marble. We test each pipe section at separate pressure before joining to the next section to avoid sudden stress on weak joints.
New Jahra sits in Jahra governorate near Jahra Mall and Jahra Hospital, a modern residential district with recent development.
We pressure test at minimum 1.5 bar for 30 minutes to confirm no leakage before final handover.
Main gas network laid and pressure-tested before walls are plastered.
Residential kitchen gas points run to correct sizing and outlet count.
Commercial kitchen gas networks sized for high demand with isolation at each appliance.
Leak located with detection instruments before any wall or floor is opened.
Ball valves fitted at the main inlet and at every branch point.
Periodic check of all valves, joints and fittings across the gas network.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We recommend fitting the meter outside the kitchen or in an open-air area for easy reading, maintenance and emergencies. If the kitchen is fully enclosed, the meter can go inside with adequate ventilation.
An average home needs one or two days for complete survey, installation and testing depending on appliance count and distances. Larger homes or those with outdoor heaters may take three days.