Copper or steel pipe run
Correct diameter pipe sized to kitchen appliance load and inlet pressure.

Mubarak Al-Kabeer
Gas line extensions in Sabhan Industrial serve factory kitchens, warehouses and central cafeterias. We measure the pressure needed for each cooktop, install separate regulators and conduct full leak testing before any industrial oven runs.
Factories and warehouses in Sabhan often have large kitchens with several cooktops and ovens, and gas meters may sit far away in utility zones behind the industrial yard. A single line is often insufficient for high-consumption appliances, so we need thicker piping and tightly controlled pressure. We also inspect the foundation and interior walls to avoid exposing pipes to excess moisture or vibration from nearby machinery.
Sabhan Industrial Area sits in Mubarak Al-Kabeer governorate and houses large factories and storage sheds where thousands of workers are served daily.
Industrial gas lines are tested under pressure higher than operating level to ensure every joint can withstand load.
Correct diameter pipe sized to kitchen appliance load and inlet pressure.
Individual outlet with isolation valve for each hob, oven or fryer.
Pipe run inside protective conduit or channel with ventilation clearance observed.
Joints finished by brazing or press-fit method suited to the pipe material.
Nitrogen pumped to test pressure and held to confirm every joint is tight.
Inspection of an existing run and repair of any corroded section or weeping joint.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but only if the line is thick enough to supply all simultaneous appliances with required pressure. We install separate pressure regulators for each oven and test the full line under maximum load.
We use certified solid copper or stainless steel piping with supports protected against vibration. Pressure is tested over extended periods to confirm no drop-off over the long distance.
