Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Mubarak Al-Kabeer
First-fix plumbing in Abu Hasaniya starts by splitting roof-tank feeds to each floor of the villa. We run horizontal distribution pipes under floor slabs and rise them vertically through walls before dry lining. Each branch is pressure-tested before covering.
Sea-facing villas in Abu Hasaniya are typically multi-storey with many bathrooms and separate bedroom wings. Vertical pipes run through central columns, and each soil stack must reach the ground floor on a regular fall. We install isolating valves at each bathroom inlet for later maintenance.
Abu Hasaniya sits in Mubarak Al-Kabeer governorate, an upscale villa zone with sea views where pipe routing demands tight planning.
Every threaded and soldered joint is tested under hydraulic pressure before walls close because reopening costs significantly more.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We draw each floor on paper before starting and set the main vertical stack route and horizontal branches. We choose the path closest to the roof tank and furthest from external walls to avoid freezing.
Internal pipes can be hidden but access points must remain at every sharp bend or main joint. This allows leak detection and maintenance after construction finishes.
