Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Farwaniya
First-fix plumbing in Andalus starts with a full site survey and marking of water and drain lines before foundation concrete pours. We install copper pipe for hot water with complete insulation and pipe for cold water and plastic for all drains. Air pressure testing at 10 bar ensures no leaks beneath future floors.
Andalus villas near Andalus Co-op are mostly modern open-plan designs with three or more bathrooms stacked vertically. The main kitchen needs a separate waste line from the scraper and sink, and each bathroom needs its own drain pipe sloping towards the main line. We measure horizontal and vertical distances precisely and mark routes on the foundation with clear markers before installation begins.
Andalus is in Farwaniya governorate near the Fourth Ring Road, where modern family villas are located with advanced services.
We test each drain section with water pressure as well as air if the site is ready, because water reveals leaks that air alone might miss.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install appropriately sized pipes with inspection points spaced so no gap between points exceeds two and a half metres. Each inspection point allows blockage clearing if needed.
We provide a plan showing each pipe location and every inspection point with exact depth. This plan is essential for the next construction phase and for future maintenance.