Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Ahmadi
Apartment piping in Hadiya begins by checking the flat layout and locating the pre-prepared main waste outlet. We run copper supply lines and galvanized drainage pipes then test pressure and cold water flow before handing over.
Most Hadiya houses are modern apartment blocks with medium two to three bedroom flats, and the main bathroom and kitchen usually sit in one zone. This design means hot water lines can reach every tap with relatively short pipe runs. We focus on water quality by visually inspecting pipes before filling under pressure, and often find construction debris requiring flushing out.
Hadiya is a modern residential area in Ahmadi near Ahmadi Town, where new apartment blocks and recently built housing are concentrated.
We run cold water alone for three minutes before any pressure test to flush suspended dirt from new pipes.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Not if we calculate the fall precisely. Every metre of horizontal run requires at least one centimetre drop. We test flow with hot and cold water together to confirm stability.
Before pressure testing we flush every line hard with tap water to push out dirt and sand. Then we open the drain at full flow to see water exit completely clean.
