First-fix plumbing for new houses
Supply and drain pipes set at correct gradients, pressure-tested and documented before screed and plaster seal them in
Pipe work from raw structure through to a pressure-tested, ready-to-plaster apartment
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
Call or WhatsApp us with photos of the apartment and its current build stage
Technician visits to measure runs and confirm supply and drain point positions
PPR and uPVC runs laid, clipped and secured before screed and plaster
Supply network air-tested and result documented before walls are closed
As-installed pipe route sketch handed over as reference for finishing trades
If screed is days away and pipe runs are not yet in, every delay raises the cost and complexity of correction
Seeing block walls rise without embedded pipe sleeves means expensive surface chasing or rerouting later
A late decision to move a basin or WC means drain gradients must be rechecked before concrete is poured
Stripping an apartment back to raw concrete opens the chance to replace corroded iron pipes and fix wrong drain falls
Handles Kuwait's high temperatures and resists the mineral scale common in local supply water
Smooth bore slows calcium deposit build-up and makes future rodding straightforward
Fusing PPR joints with heat creates a bond stronger than the pipe itself with no leak path
Reveals any supply line leak before screed using air, so no water damages the raw structure




Part of First-fix plumbing for new houses · All services · Back to the home page
No fixed rate applies; the quote depends on several factors specific to each apartment
Larger units mean longer supply and drain runs throughout the floor plan
Each additional bathroom or kitchen point increases stub-out and branch count
Project specs requiring higher-grade pipe directly raise material cost
Working after walls are closed adds breaking and making-good costs
Upper floors without a service lift raise time and labour for material handling
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else’s home is not ours to be careless in.
Do not take our word for it. Look at the work yourself.
The leak is marked before a single tile comes up.
A leak does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Six governorates, 139 areas.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but it requires breaking out the screed, relaying the drain pipe at the correct gradient, and making good. The cost and disruption are significantly higher than correcting the position before the pour, which is why early review matters.
In a new build, pipes run through an open structure without any breaking. In a full renovation, old finishes are stripped first, then the first-fix is reinstalled to current standards. Old galvanised iron pipes are typically replaced with PPR at the same time.
A digital level is used to verify the fall along each drain run before it is fixed in place. Too little gradient causes sediment to settle and eventually block; too steep a fall carries water ahead but leaves solids behind.
Yes, both cold and hot supply lines are included. The hot line is routed away from exterior exposures where possible to reduce heat gain and heat loss in Kuwait's climate.
Yes, we work on a single unit without needing a contract for the whole building. The apartment is connected to the building's main supply and drain lines in line with the approved drawings.