Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Hawalli
First-fix plumbing in Bayan starts with a complete layout of supply and waste lines before concrete pours and walls close. We run cold supply, hot supply and all drains, testing every joint under pressure before plaster and tiles go on.
Bayan houses are typically independent villas with gardens, each needing a long run of hot water from the roof tank to bathrooms and kitchen across different floors. We plan the pipe route to reduce heat loss and choose diameters that match pressure and flow rate. Before walls close, every floor is flushed with cold water first to confirm no blockages, then hot supply is brought online.
Bayan sits in Hawalli governorate, a quiet villa area near Bayan Co-op where new construction is active and foundations require precise documentation of plumbing routes.
Before handover, each drain branch is tested with a temporary test trap to confirm no blockages exist in buried lines.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We fill every line and hold it under full pressure for an hour before walls close, then inspect every joint for drips. Any leaking joint is retightened or the pipe section replaced.
Yes, but we space them adequately and wrap the hot pipe in foam insulation to prevent heat transfer to cold supply. The gap between them ensures hot pipes cool before affecting the cold side.
