Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Ahmadi
First-fix plumbing in Dhaher faces sandy soil and rock horizons close to surface. We begin with exploratory drilling to map bedrock depth before planning pipe routes. Lines are run carefully around geological obstacles and with steady fall toward collection points. Every pipe intersection is documented on the plan.
Dhaher is a sparsely built desert area where homes are isolated from each other and rely on private wells. First-fix plumbing here requires long supply pipes from a central pump station buried below ground, protected from sand and heat. Drainage is collected locally in a soakaway pit for each building, so we test soil permeability before deciding its size and depth.
Dhaher sits in Ahmadi governorate near the Saudi border, a remote desert zone where near-surface bedrock determines the install method.
Before handover every pipe is filled with pressured water and inspected by camera to confirm sand entry during digging.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, but it changes the method. We drill exploratory holes to find gaps between rock layers, then run pipes through those gaps or raise them slightly above ground with metal and thermal protection.
We use high-density polyethylene pipes with thick foam insulation wrapped around every section. Each line is tested under high pressure before burial and re-checked one week after handover.
