Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Capital
Drain installation in Yarmouk starts by mapping pipe routes from kitchens and bathrooms to the collection pit. We lay PVC pipe of specified thickness at regular fall and support it with sand and gravel. We install cleanout access at every turn and test with water from each outlet before pouring.
Yarmouk has villas and mixed residential buildings close together. When villas sit near the street, the pit may lie under public road, requiring municipality approval. We connect pipes using solvent joints or metal clamps depending on soil type and depth. Fall must be consistent along the whole route; any break in slope creates a pocket that traps solids.
Yarmouk is a mixed residential area near Yarmouk Co-op and Sports Club, where older and newer buildings sit side by side.
We inspect every pipe during laying with a mirror to confirm no slope breaks exist before it is buried.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, any work under public road needs municipality permit. We help by submitting drawings and specifications, but obtaining the permit is your responsibility.
If the pipe was not fully tested before pouring, digging up and reinstalling is necessary. This is why we pressure-test with strong water flow before pouring to confirm every joint holds.
