Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Capital
First-fix plumbing and electrics in Rai covers a wide commercial zone of shopping centres, storage and workshops. We run supply, waste and electrical distribution through raised floors, walls and ceilings, testing each section before covering.
Rai commercial buildings are wide and open with raised floors and high ceilings allowing long horizontal plumbing and electrical runs. Each retail or commercial unit has dedicated water and waste points from a central meter room. We run main lines under raised floors for maintenance access, with branches running up concrete columns to each unit. Pressure and insulation testing happens in phases as each site section completes.
Rai is in Kuwait City, home to major shopping centres and commercial complexes like The Avenues and IKEA in a free-trade zone.
Rai commercial buildings require staged pressure tests because long runs mean joints far from supply are more vulnerable.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We maintain standard clearance under raised floors of 60 to 90 cm so technicians can walk and reach every pipe. Main lines are fixed to adjustable steel supports and labelled for easy repair.
Right after each branch to the unit is complete and before walls or floors close. We pressure and insulation test and log results on a unit-specific form before handover to the fit-out contractor.
