Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

First-fix plumbing for new houses
Correct routing from the start keeps water, drain and electrical lines out of conflict and prevents costly tile-breaking later
Combined plumbing and electrical first-fix for new residential and commercial builds
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
Share building drawings and current construction stage
Pipe routes and rough-in points identified before site visit
Construction stage confirmed and coordination with other trades done
Supply, drain and conduit runs installed with water pressure test
As-built pipe route drawing handed over with pressure test record
Ideal window to run pipes and conduits before screed and plaster close them in
Water pipes crossing electrical conduits or drain lines without prior coordination
Moving a basin or toilet position requires resetting rough-in points before walls close
Supply network entered finishing stage without a leak test to catch early faults
Separate execution without coordination leads to clashes found only after plastering
Fixing heater position after finishing forces exposed pipe runs and extra cost
Closing walls with no pipe route drawing turns every future repair into guesswork
Kuwait's summer heat expands PPR pipes and rigid fixing without allowance causes cracking




Part of First-fix plumbing for new houses · All services · Back to the home page
No fixed rate applies; these factors shape the quote for each job
Each floor adds vertical risers and horizontal runs to the scope
Specified pipe type and diameter directly affects material and labour cost
Number of distribution boards and cable runs determines electrical scope
Central heater systems need longer distribution runs than individual units
Concurrent work with AC or structural contractors adds coordination requirements
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else’s home is not ours to be careless in.
Do not take our word for it. Look at the work yourself.
The leak is marked before a single tile comes up.
A leak does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Six governorates, 139 areas.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Plumbing first-fix covers supply and drain pipe runs and rough-in points before walls close. Electrical first-fix covers conduits and distribution boards. Running both together prevents route conflicts hidden inside walls.
Water pipes and electrical conduits share the same wall and ceiling cavities. Poor route planning means breaking tiles later to reroute. Early coordination resolves conflicts before plaster and screed seal them in.
Changes are possible but require breaking the screed and possibly finished tiles, raising cost considerably. Finalising fixture positions before the screed is poured is always the right approach.
High summer temperatures cause PPR pipes to expand, so each fixing point needs a movement allowance. Older galvanised iron pipes are stressed by both heat and the mineral content of Kuwaiti water.
We hand over an as-built drawing showing water, drain and electrical conduit routes inside walls and ceilings, along with the pressure test report confirming the supply network is sound before it is sealed.