Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Jahra
Pipe and wire routing in Sulaibiya starts before concrete is poured in foundations and ground slabs. We plan the routes from engineering drawings and run copper and PVC pipework beneath the floor slab while laying electrical conduit beside it. Every joint and run is inspected before walls close.
Sulaibiya is a district of family villas under construction, and the shallow sand foundation demands careful trench depth to protect pipe routes. We split water supply and drainage into separate runs on opposite sides of the plot to keep them clear of electrical conduits. Before concrete is poured we photograph every route and file a photo record signed by contractor and engineer.
Sulaibiya lies in Jahra governorate, a residential expansion zone where hundreds of new villas are being built simultaneously.
Water lines are pressure-tested at 10 bar for two hours before handover of phase one because leaks under the slab are hard to repair later.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We separate the routes at the planning stage and draw them on the site plan before excavation begins. Drainage goes on one side and electrical conduit on the other with a minimum half-metre clearance between them.
Inspection happens before concrete is poured and before walls are closed, and we coordinate with site progress to ensure enough time. If inspection is delayed we photograph the route before it is covered.