Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Farwaniya
First-fix in Ishbiliya requires careful planning for modern villa layouts with large kitchens and multiple bathrooms. We extend multi-level distribution networks from the main tank, connect every drain outlet with sloped pipes, and pressure-test before walls close hours later.
Ishbiliya Co-op villas feature spacious rooms and elevated floor levels, giving better options for hiding pipe runs under slabs and wall cavities. We use load-bearing walls for vertical drain stacks and raised floors for easy horizontal hot-water distribution. Copper supply lines for hot water are insulated against condensation, and drainage collects in a single point with fall calculated to the sump.
Ishbiliya sits in Farwaniya governorate, an upscale residential zone with contemporary designs where residents prefer spacious villas.
We check every drain branch slope with a laser level and record measurements because weak fall causes water pooling and odour within weeks of handover.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We run them close together to reduce wall penetrations, but insulate hot-water pipes with foam sleeves to prevent heat loss and moisture condensation. A 5 cm gap between them prevents heat transfer to the cold line.
We test the standard sump capacity on-site and calculate total drainage volume from all bathrooms and kitchen at peak use. If the sump is undersized we recommend enlarging it or adding a monitoring tank before final connection.