Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Jahra
Kitchen first-fix in Amghara starts by mapping sink position and estimating waste distance from the yard. We run supply lines with thermal expansion protection and install waste at even gradient toward the main tank or municipal line. Every line is filled and tested before closure.
Amghara sits near the industrial area where houses are usually larger with additions like outdoor kitchens or ovens. The main drain may be relatively far from the indoor kitchen, meaning longer and deeper waste lines. We check the underground waste path before starting and examine the fall carefully as the floor may be uneven. We leave a drain valve at the lowest point in the waste line for future maintenance and install a trap with an access box below ground that is easy to clean.
Amghara is a residential area near the industrial zone in Jahra governorate, with larger houses and longer distances.
Before closure, the waste is tested with cold and hot water separately to ensure no pipe shift from thermal expansion.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the drop exceeds one and a half metres we suggest a small lift tank with a pump underground in the yard. This allows gravity drainage from the kitchen to the tank, then the pump lifts water mechanically toward the main line.
Prefer them at least 30cm apart because cold waste cools the hot pipe and causes heat loss. If space is very tight we insert insulation between them or wrap the hot pipe in stronger insulating material.
