Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

First-fix plumbing for new houses
Correctly sized PPR supply lines, graded waste runs and grease-trap venting, all pressure-tested before screed is poured.
Hot and cold supply, waste and vent lines positioned before any finishing begins
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
Describe the build stage and the connection points needed in the kitchen
We inspect the site to plot pipe routes, drain fall and gas stub position
PPR, uPVC and gas lines laid and bracketed to the agreed drawing
Supply lines held at test pressure; result recorded before any wall is closed
A simple as-built sketch of point positions handed over for the finishing team
Withstands Kuwait roof-tank heat and resists the mineral scale that narrows older metal pipes
Lightweight and grease-resistant, joined at a precise gradient to prevent fat build-up inside
Allow fine adjustment of pipe runs without heat welding, sealed with a rated rubber ring
Fitted to the manifold to confirm steady pressure before sign-off and wall closure
Mark sink, dishwasher, fridge and cooker positions on a sketch before work begins
Both gas stub and electrical point are hard to add once the wall is plastered and tiled
Tell us whether the slab is poured and whether block walls are up or still open
Confirm heater type so the stub-out is set at the right height and pipe diameter




Part of First-fix plumbing for new houses · All services · Back to the home page
No fixed rate applies; these factors shape the quote after the site is assessed
Each added outlet (dishwasher, fridge, heater) increases pipe runs and fittings
Running a gas stub adds different materials and a separate pressure-test procedure
Greater distance to the main stack increases pipe quantity and support brackets needed
Higher pressure-class or thicker-wall pipe raises material cost directly
Kitchens needing simultaneous electrical first-fix require coordinated site visits
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else’s home is not ours to be careless in.
Do not take our word for it. Look at the work yourself.
The leak is marked before a single tile comes up.
A leak does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Six governorates, 139 areas.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Moving a drain outlet after the slab is poured means cutting into concrete, which is possible but adds cost and disruption. Fixing the position beforehand avoids this entirely.
Cooking fat solidifies inside the pipe as it cools. A steeper gradient moves grease toward the trap before it can settle. Bathroom waste carries far less fat so a shallower fall is acceptable.
A standard kitchen with a sink, dishwasher and one heater point is typically finished in one visit. Large kitchens combining multiple appliances and a gas line may need a second day.
The drain stub and vent connection for the grease trap must be set during first-fix. The trap body itself can be fitted later, but its position and pipe opening must be built in before the floor is closed.
Yes, particularly for runs buried in walls. Kuwait's ambient wall temperatures raise pipe surface heat; insulation reduces heat loss and protects PPR joints over the long term.