Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Ahmadi
Kitchen first fix in Fintas means routing all pipes precisely before walls close. We lay hot and cold supply lines, waste runs and vent stacks in the right positions and test each line. We record heights and distances carefully to prevent later drilling. Work completes before any final cladding begins.
Fintas homes near Fintas Co-op often feature open-plan kitchens flowing into living rooms, meaning all pipe runs must pass under the floor or behind interior walls with precision. We mark the sink position, dishwashing point and refrigerator placement before starting, because every extra metre of pipework must be visible or neatly concealed, not trapped under new tiles. The waste line needs steady fall toward the main stack, and the vent stack must rise freely without sharp bends.
Fintas lies in Ahmadi governorate, a coastal residential area where modern kitchen layouts demand precise pipework planning before walls close.
Every water line is pressure-tested for one hour before site handover, because reopening walls later becomes very expensive.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The vent stack usually runs in a corner or behind a side wall away from the direct cooking area. It must reach roof level without sharp bends that trap smells and steam.
We draw a precise map recording every pipe under the floor before tiling starts. This map stays with the building papers so no one drills near the runs later.