Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Ahmadi
Kitchen first-fix at Mina Abdullah is staged around port schedules and coastal security protocols. Fresh water is scarce in the zone, so local storage tanks are fitted. Waste is treated before sea discharge. All pipes are secured with corrosion-resistant brackets.
Staff and worker facilities at Mina Abdullah sit near oil berths and salt-water channels. Fresh water supply is limited and rationed, so a local storage tank at adequate capacity is fitted to cover peak use. Copper pipes are wrapped in anti-corrosion tape or replaced with stainless steel. Waste does not discharge directly to sea but is collected in a treatment tank for environmental review. We work with port and environmental authorities to meet coastal standards.
Mina Abdullah in Ahmadi governorate is a major oil export terminal on the Gulf operated by Kuwait Petroleum Corporation.
Every water storage tank is sanitised and chemically tested before connection to ensure potable quality for cooking.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Fresh water supplies are tight and pressure fluctuates under heavy industrial load. A tank ensures stable supply to the kitchen with no interruptions during working hours.
Waste collects in a separate treatment tank and is environmentally reviewed before discharge. Port and environmental authority protocols are followed precisely.
