Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Hawalli
First-fix plumbing in the Ministries Area demands precise layout because government buildings need complex drainage and supply networks serving many floors. We run cold water, hot water and waste lines before wall closure, then pressure-test each section with compressed air to confirm no leaks. We document all pipe routes on site drawings so maintenance teams find them easily later.
Large administrative buildings near the Civil Service Commission share similar traits: a main drainage stack dropping from roof level, and a central supply riser branching to departments. We must locate inspection points on each floor before concrete pours, because adding them later breaks the structure. We calculate long vertical falls with partial horizontal runs to keep drainage steady, and coordinate with other plumbers if offices and flats are leased independently.
The Ministries Area lies in Hawalli near the central government complex, an administrative zone where pipes run hidden within multi-storey walls and floors.
We test every drainage branch at 3 bar air pressure for 15 minutes before floor handover because fixing leaks after wall closure means breaking out entire partitions.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Before closure we fill the pipes with clean water and watch for 24 hours to detect pressure drop. We clean and dry every joint before final assembly and testing. This ensures no moisture inside pipes causes corrosion later.
We install isolation valves and stop-points at each department's entry so supply can be cut without affecting others. We leave spare empty conduits in walls to make rerouting easier without breaking structures.
