Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Capital
First-fix plumbing in Qadisiya serves family villas and residential buildings near Kuwait SC stadium where pipes demand precise coordination with foundations. We map every route on execution drawings and test sections under pressure before closing slabs and walls.
The area around Qadisiya Co-op mixes older villas and new buildings with nearby sports facilities. We run supply lines from each building's individual meter through pre-planned slab voids and branch toward each fixture group. Drainage is collected at steady fall to a main inspection box then to the neighbourhood sump. In multi-storey buildings we use copper pipes for vertical branches because they are stiffer and handle heavy load better.
Qadisiya sits near Kuwait SC stadium in the capital, a densely built district with a mix of villas and apartment blocks.
We record every inspection box and supply pipe location on an as-fitted drawing for ease of maintenance and fault-finding later.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We study structural drawings beforehand and coordinate with the contractor to leave voids in the slab before pour. If no void exists we run pipes under the base with rigid metal protection or above it with steady slope.
Copper is stiffer and handles high pressure in long runs, but costs more. We use it for main vertical branches and plastic for horizontal sections where pressure is lower and cost is less.
