Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Mubarak Al-Kabeer
First-fix plumbing in Qosor covers deep underground water lines and drainage from new building roofs. We set the roof tank level, run the main riser from the central pit and install vertical waste pipes before interior walls are built.
Qosor residential buildings often rise three or four storeys, meaning long supply runs from the ground floor to the roof. We run copper or plastic pipes along exterior walls or inside dry walls, with thermal breaks at each floor. Drainage needs many vertical branches to collect water from multiple bathrooms, and each branch must slope steadily toward a ground floor trap. We water and pressure-test all lines before tiling or plasterboard covers them.
Qosor sits south of Mubarak Al-Kabeer and holds a mix of family houses and small residential buildings.
We test vertical pipes from roof to ground because leaks high up travel down through walls.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We wrap pipes with soft foam tape in areas near bedrooms. This dampens pipe vibration when water flows fast.
We run a strong horizontal supply line from the riser to the tank with supports every 1.5 metres. The horizontal run may need a larger diameter to keep pressure adequate at distant taps.
