First-fix plumbing in Shuhada depends on careful planning of vertical pipe routes through internal walls before electrical installation. We run hot and cold supply lines in parallel with proper spacing and install soil stacks checking gradual falls before walls are closed with blockwork and render.
Most new houses in Shuhada are built on medium-sized plots with three to four bathrooms. We position the main stack close to the kitchen and master bathroom for ground-floor units, and run horizontal branches at minimum 2 percent fall to floor traps. Supply lines need thermal insulation in external walls to prevent hot water loss during cold snaps.
Shuhada sits in Hawalli governorate, a newly built residential district where first-fix plumbing requires precision in distances between bathrooms and the kitchen.
Each supply line is tested at 16 bar for 15 minutes before final fixtures because a small leak under the sand causes wall dampness later on.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The stack must run without sharp bends from the lowest point in the bathroom to at least 30 centimetres above the roof. This stops backflow and odours and lets air in when water drains.
Yes if they are at the same level and distance is very short, but we use Y-junctions instead of sharp bends to reduce flow resistance. We test the fall from both branches together before closing the walls.