Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Capital
First-fix plumbing in Shuwaikh means running supply and drain pipes through the concrete walls before any plastering starts. We set pipe routes from the structural plan, run water-pressure tests on every line before the wall closes, ensure grey and black waste separate into correct tanks, and finish all plumbing before the plasterer arrives.
Most new houses in Shuwaikh are two or three storeys with an internal courtyard, and the roof tank usually sits on the first or second floor. We run pipes through load-bearing walls at precise angles to avoid breaking structure later, and drains slope to the basement where an inspection chamber sits near the street boundary. Each branch is pressure-tested separately before the wall seals, because any leak found after plastering means breaking and rebuilding.
Shuwaikh lies in Kuwait governorate near Shuwaikh Port, where new houses are built alongside older workshops and storage yards.
Pipes are tested at 6 bar pressure for two hours before wall closure because fresh concrete demands high-standard confirmation.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, they need 30 centimetres minimum separation to stop hot pipes warming cold water. We position supply high in the wall and drains low to let gravity work properly.
After successful pressure testing and the engineer's approval of pipe routes. We hand over test certificates and a marked plan showing every pipe location so the plasterer does not damage them.