Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Capital
First-fix plumbing in Surra builds complex pipe networks for modern villas with underfloor heating and multiple bathrooms. Thin pipes run under heating tiles without any joints inside the floor. Pipes are pressure-tested before heat tiles are laid. Every section is mapped in 3D to prevent drilling later.
Luxury villas in Surra near Surra Co-op have main bathrooms, guest bathrooms and staff quarters on different floors. We run pipes from the roof tank to each bathroom in separate lines with steady pressure valves. Underfloor heating pipes gradually loop from a boiler room on the ground floor. Waste from bathrooms and kitchen flows to a central inspection chamber then to the street main. Everything is pressure-tested after piping but before any fixtures are fitted.
Surra lies in Kuwait governorate beside the Fourth Ring Road, a prestige residential zone known for large villas.
Underfloor heating pipes are tested at 3 bar before boiler startup because high pressure might damage sensitive floor systems.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use long unbroken pipes running from the boiler room to each zone without mid-line joints. Valves and fittings sit outside the floor in accessible junction boxes.
We leave spare drain pipes from the main bathroom to the central chamber empty for future use. The plan marks every spare conduit so the floor need not be broken if expansion is needed.
