Supply pipework
Hot and cold PPR lines run inside walls to each fixture

Capital
Bathroom and kitchen plumbing in Adailiya balances heritage villas and modern apartment buildings in the same area. Old villas often need complete rerouting of existing drain runs. New buildings near Adailiya Co-op demand careful planning of shared pipework. Each job starts by studying old drawings and measuring current heights.
Adailiya has heritage villas with uneven floors and uneven foundations alongside new apartment buildings with level ground floors. Old villas may need raised drain outlets or rerouted ancient pipes buried under dated tiles. We check existing soil and moisture because some villas are old and foundations may need renewal. In new buildings near the German Embassy we fit accessible cleaning valves in corridor walls.
Adailiya sits in Kuwait City near the German Embassy and Adailiya Park, a mixed district of old villas and new apartment blocks.
Old pipes are surveyed with an inspection camera first because buried lines from decades ago may be blocked or cracked.
Hot and cold PPR lines run inside walls to each fixture
uPVC drain pipes set at correct fall to prevent sediment buildup
Dishwasher, sink and grease-trap connections run and tested
Individual valve per circuit so one fixture shuts off independently
Network pressurised before plastering to expose any weak joint
Toilets, basins and mixers connected after final finishes are complete
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Sometimes we reroute the entire run above ground through exterior walls or false ceilings to avoid cracking original tiles. If the tiles are already damaged, we open only over cracked drain sections and reset new tiles matching the size.
We use flexible piping and slightly movable brackets to absorb slow foundation settlement. Outlets are checked every six months and we monitor cracks near fixed points to ensure pipes stay connected.
