Supply pipework
Hot and cold PPR lines run inside walls to each fixture

Capital
Bathroom and kitchen plumbing in Qairawaan starts by reading the location of load-bearing columns and walls before any wall-chasing begins. We run cold and hot supply from the meter, lay drain pipes on a steady fall toward the main stack and pressure-test everything.
Qairawaan buildings are often mid-rise apartments where the main stack is central and serves several units, so drain runs are relatively short. We check the height difference between the bathroom floor and the stack first to decide whether we need a pump or natural gravity. In older kitchens with existing fittings, a waste pipe may still be usable so we tie the new sink into it rather than chase another wall.
Qairawaan sits in Kuwait governorate near the Seventh Ring Road, an area mixing older houses with relatively newer residential blocks.
Every threaded and soldered joint is tested with compressed air at 10 bar for 10 minutes before walls are closed.
Hot and cold PPR lines run inside walls to each fixture
uPVC drain pipes set at correct fall to prevent sediment buildup
Dishwasher, sink and grease-trap connections run and tested
Individual valve per circuit so one fixture shuts off independently
Network pressurised before plastering to expose any weak joint
Toilets, basins and mixers connected after final finishes are complete
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Only if the waste cannot drop naturally at enough gradient. We measure the height between kitchen floor and stack level, and if it falls less than 15 cm per 3 metres we suggest a small pump unit under the sink.
Cold and hot supply pipes can be hidden by chasing the wall. Drain pipes must keep a steady fall and stay accessible for maintenance, so we hide them behind thick walls or panels rather than deep chases.
