Supply pipework
Hot and cold PPR lines run inside walls to each fixture

Capital
Bathroom and kitchen plumbing in Qibla starts by reading the layout and measuring the space available. We run hot and cold risers from the main stack and slope the waste line steadily toward the stack. Every joint is tested with air pressure before handover.
Qibla homes near Gulf Road are often multi-storey with kitchens at the core and bathrooms spread across floors. The main stack usually runs inside an outer wall, making later maintenance access straightforward. We set floor traps and WCs at standard heights and test every drain branch with water before tiling.
Qibla sits at the heart of Kuwait City near Seif Palace, a vertical residential zone where plumbing must be planned carefully through multiple floors.
We check drain slope with a water level to ensure water flows without pooling at any point along the line.
Hot and cold PPR lines run inside walls to each fixture
uPVC drain pipes set at correct fall to prevent sediment buildup
Dishwasher, sink and grease-trap connections run and tested
Individual valve per circuit so one fixture shuts off independently
Network pressurised before plastering to expose any weak joint
Toilets, basins and mixers connected after final finishes are complete
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Hot and cold supply lines rise inside a single vertical stack, usually in an outer wall or hallway corner. Drain pipes slope downward at 5 mm per metre toward the main stack on the lower floor.
Drains must slope naturally, so if headroom is tight we raise the outlet on the wall. We choose the route that keeps proper fall without unnecessary tile breaking.