Supply pipework
Hot and cold PPR lines run inside walls to each fixture

Jahra
Bathroom and kitchen plumbing in Waha begins by understanding the house layout, floor levels and fixture heights. We run supply lines with balanced sizing and connect drains at steady falls through walls and foundations. Every section is pressure tested before tiling begins.
Waha houses have bedrooms and bathrooms spread across two or three floors, meaning hot water needs a long vertical route from the heater. We install main supply pipes at larger bore on the ground floor and reduce sizes at branches for upper bathrooms. Upper bathroom drains run down through moisture-proof walls and merge with lower drain pipes before the main floor trap.
Waha is a multi-storey residential area in Jahra governorate where family homes with multiple levels demand complex vertical plumbing runs.
Each drain branch is tested separately before joining the main run to ensure the fall remains unobstructed.
Hot and cold PPR lines run inside walls to each fixture
uPVC drain pipes set at correct fall to prevent sediment buildup
Dishwasher, sink and grease-trap connections run and tested
Individual valve per circuit so one fixture shuts off independently
Network pressurised before plastering to expose any weak joint
Toilets, basins and mixers connected after final finishes are complete
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we secure pipes on metal brackets every one and a half metres to prevent sag and excess load at joints. We verify spacing and plumb before delivery.
We measure each height and study the drain fall available from each floor. If the upper floor fall is tight we choose smaller-bore pipes or raise the lower floor trap slightly.