Bathroom plumbing
Supply and drain lines to all bathroom fixtures and outlets

Mubarak Al-Kabeer
Planned plumbing in Funaitees begins by checking building foundations, as it is an older residential area with some houses lacking modern basements. We run pipes over narrow foundations and beneath old concrete floors, testing pressure carefully.
Funaitees houses are old with very narrow foundations, meaning water and drain pipes must pass over concrete or directly beneath floors. We open small sections of old flooring to create a channel for new pipes and protect them with metal sleeves. If floors are damp, we place small French drains under the channel before sealing.
Funaitees lies in Mubarak Al-Kabeer governorate, an older residential area marked by houses with tight, shallow foundations.
Before cutting old floors, we sound-test concrete thickness to avoid striking existing pipes.
Supply and drain lines to all bathroom fixtures and outlets
Hot and cold supply lines and drain runs under the sink
Flexible PEX runs that handle Kuwait's high ambient temperatures well
Setting correct fall angles to prevent sediment buildup and early blockages
Isolation valves on every circuit so future repairs do not shut the whole building
Pressurising the network before plastering to catch any joint failure early
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We cut narrow channels only at calculated depth to avoid rebar and load-bearing concrete. After pipes pass through, we refill the trench with fresh concrete and compact it thoroughly.
We trace the damp source first and install a small perimeter drain beneath the pipe route. Then we cover the channel with a moisture barrier before pouring fresh concrete.
