PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Farwaniya
Flexible PEX runs in Ardhiya Warehouses deliver cold water to cooling systems, bathrooms and kitchens without risk of sudden leaks. We connect from the main water line to each storage section and maintenance point, testing the entire network under pressure before operations begin.
Ardhiya warehouses are long buildings with high ceilings and thick concrete floors, often expanded later with new sections added. We lay PEX under the slab or along interior walls so that new tapping points can be added later easily. The flexible tube fits sharp corners and narrow aisles between shelving without needing many metal fittings.
Ardhiya Warehouses district sits in Farwaniya governorate near Gulf Road and attracts large-scale commercial storage facilities.
We finish installation by filling the trench with sand and gravel before pouring a fresh concrete layer over the buried pipes.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
New pipes connect to existing tubes using compression fittings. We test pressure at 50 bar to confirm the new joint holds before closing the wall or floor.
In enclosed warehouses no extra shielding is needed because pipes stay buried in the floor or hidden behind walls. If we run PEX above the slab in an exposed area, we cover it with a protective metal conduit.
